Want to wade into the sandy surf of the abyss? Have a sneer percolating in your system but not enough time/energy to make a whole post about it? Go forth and be mid.
Welcome to the Stubsack, your first port of call for learning fresh Awful youāll near-instantly regret.
Any awful.systems sub may be subsneered in this subthread, techtakes or no.
If your sneer seems higher quality than you thought, feel free to cutānāpaste it into its own post ā thereās no quota for posting and the bar really isnāt that high.
The post Xitter web has spawned so many āesotericā right wing freaks, but thereās no appropriate sneer-space for them. Iām talking redscare-ish, reality challenged āculture criticsā who write about everything but understand nothing. Iām talking about reply-guys who make the same 6 tweets about the same 3 subjects. Theyāre inescapable at this point, yet I donāt see them mocked (as much as they should be)
Like, there was one dude a while back who insisted that women couldnāt be surgeons because they didnāt believe in the moon or in stars? I think each and every one of these guys is uniquely fucked up and if I canāt escape them, I would love to sneer at them.
(Credit and/or blame to David Gerard for starting this.)


Starting this Stubsack off, Iranās Islamic Revolutionary Guard Corps have threatened to blow up OpenAIās Stargate datacentre in Abu Dhabi.
Theyāve already bombed commercial data centres before, so Iām inclined to believe this isnāt an empty threat.
Waiting for Yud to provide his whole-chested support for IRGC any second
I assign a relatively low probability, non-zero but not much more than 5%, maybe a solid 5.5%, that Yud goes even beyond that and implies that he is the 12th imam emerging from occultation
IRGC doing their part to Halt AI. Donate to them now!
aside from everything else, as posted by ed zitron previously i doubt that anything is really getting built there
Interesting, got a link?
thereās been a claim of 200ish GW of new datacenters announced but itās only something like 5GW being built and only a fraction of that is actually finished or powered on. this mostly goes for american ai dcs, which are 3/4 of them all. not sure if it holds for emirates, but it would completely not surprise me if itās the case there also https://www.wheresyoured.at/the-ai-industry-is-lying-to-you/#how-much-actual-data-center-capacity-came-online-in-2025-my-estimate-3gw-of-it-load
https://www.wheresyoured.at/premium-how-much-of-the-ai-bubble-is-real/ (paywalled) linked claim for 190GW https://www.sightlineclimate.com/research/data-center-outlook linked claim for 240GW https://paulkedrosky.com/chart-of-the-day-data-center-buildout-slowed-sharply/
Thanks for the sources Iāll come back after I do some reading!